Agra Metro Phase-2 Elevated Viaduct Piling (AGCC05)

Roads & Metro · Agra, Uttar Pradesh · 2025 · Client: Agra Metro (AGCC05)

ND Infra is carrying out piling work for the AGCC05 package of Agra Metro Phase-2. The package covers the design and construction of an elevated viaduct and 14 elevated stations on the balance section, together with ancillary structures, architectural finishes, E&M works and PEB structures. We work for RKM Engineering and Infrastructure Pvt. Ltd. Metro viaducts rest on deep pile foundations built in a busy city with tight working space. A team of 48+ people is on this assignment, which is planned to take about 1.5 years.

Agra Metro Phase-2 Elevated Viaduct Piling (AGCC05)Agra Metro Phase-2 Elevated Viaduct Piling (AGCC05)Agra Metro Phase-2 Elevated Viaduct Piling (AGCC05)

Key features

  • Pile foundations for an elevated metro viaduct
  • Part of a package covering 14 elevated stations
  • Urban work in tight spaces with live traffic
  • Metro rail work in Uttar Pradesh

Project details

  • Duration: 1.5 years
  • Team on site: 48+
  • Stations in package: 14 elevated
  • Main contractor: RKM Engineering & Infrastructure Pvt. Ltd.