Approach Road for Bridge No. 481A (SER)
Roads & Metro · Odisha · 2024 · Client: South Eastern Railway
ND Infra built the diversion and approach road from the National Highway to the A1 side of Bridge No. 481A for South Eastern Railway. The work included the supply, laying and compaction of WBM (water bound macadam). The contractor was Twamev Constructions and Infrastructure Limited. The road gives vehicles and plant access to the bridge site. A team of 25+ people completed it in about 7 months.


Key features
- Diversion and approach road construction
- Supply, laying and compaction of WBM
- Access from the National Highway to the bridge's A1 side
Project details
- Duration: 7 months
- Team on site: 25+
- Scope: Diversion & approach road (WBM)
- Main contractor: Twamev Constructions & Infrastructure Ltd.