Hatia–Bondamunda Doubling: Major Bridge No. 694
Railway · Nawagaon–Bangurkela, Odisha · 2019 · Client: South Eastern Railway
ND Infra carried out pile load testing and pile work for Major Bridge No. 694 (2 × 18.30 m + 7 × 30.50 m composite girder) at Km 572/5-10, between Nawagaon and Bangurkela stations. The bridge is part of South Eastern Railway's Hatia–Bondamunda doubling in the Chakradharpur division. The contractor was SPS Construction & Engineering Works. The bridge has nine spans, so it needed a large number of deep pile foundations. A team of 50+ people completed the work in about 1.5 years.


Key features
- Foundations for a 9-span major railway bridge
- Spans: 2 × 18.30 m + 7 × 30.50 m composite steel girder
- Part of the Hatia–Bondamunda line doubling
- Pile load testing to Indian Railways requirements
Project details
- Duration: 1.5 years
- Team on site: 50+
- Bridge spans: 2 × 18.30 m + 7 × 30.50 m
- Main contractor: SPS Construction & Engineering Works