High-Level Bridge over Jujughat Nallah, Nuapada

Bridges & ROB · Nuapada, Odisha · 2024 · Client: R&B Division, Khariar (Govt. of Odisha)

ND Infra carried out the pile work for a high-level (H.L.) bridge over Jujughat Nallah at Ch. 3.500 km on the Boden–Patalganga–Bhoisadani road in Nuapada district, Odisha. The client was the Superintending Engineer, Khariar (R&B) Division, and the contractor was M/s RBS Constructions. A team of 50+ people completed the foundation work in about a year, giving the area an all-weather river crossing.

High-Level Bridge over Jujughat Nallah, NuapadaHigh-Level Bridge over Jujughat Nallah, NuapadaHigh-Level Bridge over Jujughat Nallah, Nuapada

Key features

  • Pile foundations for a high-level bridge
  • All-weather crossing over Jujughat Nallah
  • Rural road connectivity in Nuapada district

Project details

  • Duration: 1 year
  • Team on site: 50+
  • Scope: Pile work
  • Main contractor: M/s RBS Constructions

Back to all projects · Discuss a similar project