Rourkela – Koyal Wadi Railway Project

Infrastructure · Rourkela – Koyal Wadi · 2021 · Client: TSPS Pvt. Ltd.

The Rourkela – Koyal Wadi Railway Project was executed by TSPS Pvt. Ltd. with ND Infra managing multiple critical aspects including piling work, road testing, and full-scale Ready-Mix Concrete (RMC) setup and production. ND Infra established an on-site batching plant to ensure consistent concrete quality, performed load and integrity tests for piles, and conducted road surface testing to meet railway standards. This integrated execution ensured a high-quality, durable, and timely project delivery.

Rourkela – Koyal Wadi Railway ProjectRourkela – Koyal Wadi Railway Project

Key features

  • On-site Ready-Mix Concrete (RMC) plant setup and operation
  • Piling work and integrity testing
  • Road testing and compaction quality checks
  • Self-managed concrete production and quality assurance
  • Railway infrastructure construction and foundation works
  • Executed in collaboration with TSPS Pvt. Ltd.
  • Compliance with Indian Railway construction standards

Project details

  • Concrete Produced: 10,000+ cubic meters
  • Duration: 18 months
  • Team Size: 120+ workers and engineers
  • Batching Plant Capacity: 30 m³/hr
  • Piles Tested: 200+
  • Road Test Length: 5 km